A Lakshy project for a trailer or tanker builder commonly starts with awareness training for management, engineers, supervisors and welders’ leads, so the purpose of the standard is understood on the shop floor as well as in the office. A gap analysis then follows an order through enquiry, design, procurement, fabrication, testing, delivery and service, noting where control is missing.
In the documentation workshop an experienced ISO/GRC expert helps the team set down design and drawing control, supplier approval, welding and fabrication checks, inspection and test plans, calibration and the handling of non-conforming work. Implementation assistance supports the first production runs under the new system. An internal audit and management review follow, then a pre-assessment audit, before the accredited certification body carries out its audit with Lakshy on hand to facilitate.
Companies running a first system often choose Drive™, where we develop and implement end to end. When the standard is later revised, Revise™ manages the transition so the system stays current, and our internal audit service keeps the checks going.