How a Lakshy project for an equipment manufacturer typically runs
A project of this type opens with awareness training for managers and supervisors from design, production, quality and stores. The gap analysis then reviews how orders are reviewed, how designs are verified, how fabrication and lamination stages are controlled and how final inspection is recorded.
The gap report drives the writing of the quality manual, functional processes, SOPs, work instructions, guidelines and formats. For a fabricator these typically include contract review, design control, material receipt inspection, process control, testing, non-conforming product handling and customer feedback. The management representative formally issues them to users, and the consultant works with that person throughout.
The internal audit comes next, with findings taken to the management review meeting so that management can close actions. After a positive outcome, the company moves to the final certification audit by an accredited certification body.
For manufacturers, Drive™ suits teams that are busy with orders and want Lakshy to develop and implement end to end, while Design™ suits those with a capable quality team. Sustain™ keeps audits and reviews on a calendar after certification, and Revise™ manages later transition to new editions of the standard.