GMP Consultants in Silvassa
Good manufacturing practice is the regulatory basis on which drug plants are licensed and inspected. In Silvassa it concerns the WHO-GMP certified units at Piparia, Athal, Dadra and Naroli and the smaller plants upgrading to revised Schedule M.
Get Started
ISO consultants in Silvassa reply within one business day. hello@lakshy.com · +91 98217 80035
Drug plants across Silvassa’s estates and villages
Dadra & Nagar Haveli district has a compact but established group of drug manufacturers. CDSCO’s list of WHO-GMP certified units for Certificates of Pharmaceutical Products, based on data received from States and UTs as on December 2022, records six in the district, with addresses in the Piparia government industrial area and Athal in Silvassa, at Dadra and at Naroli.[1] The certificates on that list support export of finished products, so these plants work under Indian licensing and under the registration rules of the countries they ship to.
The district’s wider industry shapes the risks. The UT’s RAMP plan identifies electrical equipment among Dadra & Nagar Haveli’s major industries and puts drugs and pharmaceuticals at 15% of the UT’s total exports.[2] A drug plant in an industrial district of this kind shares roads, utilities and contractor pools with non-pharmaceutical neighbours, which makes contamination control, visitor management and contractor discipline part of everyday GMP rather than a special event.
For a Silvassa unit, GMP is therefore less about a single inspection and more about keeping documentation, equipment and people in a state that any inspector, domestic or foreign, could walk in on.
The six listed units are spread across separate locations rather than one pharmaceutical park, from the government industrial area at Piparia to Dadra on the district’s edge.[1] Each site carries its own water system, HVAC, utilities and waste arrangements, so each needs its own qualification and monitoring programme instead of relying on shared infrastructure. Plants that also make products for other licence holders under loan or contract arrangements add a further layer of quality agreements and technical transfer records.
Living with the revised schedule once the extension has run out
The Government of India notified revised Schedule M on 28 December 2023. Large manufacturers had six months and implemented it from 28 June 2024; small and medium manufacturers with turnover of Rs. 250 crore or less could extend to 31 December 2025, provided they filed an upgradation plan in Form A with the Central Licence Approving Authority within three months from 11 February 2025.[3] That date has passed, and every Silvassa plant is now judged against the revised requirements.
The common findings in a post-deadline review are predictable: a quality risk management process that exists on paper but does not drive decisions, equipment qualification files that stop at installation, cleaning validation that does not reflect the current product mix, and laboratory data that cannot be traced to its raw record. Fixing these is mostly a matter of discipline and documentation, with capital spending reserved for HVAC, water systems and segregation.
Plants that filed a Form A plan have a further task: showing that each committed upgrade was completed, and that the procedures written for it are being followed on every shift.
Training is the area inspectors test by conversation. An operator at a Silvassa granulation room or packing line should be able to explain why a step matters, what to do when a reading drifts and whom to call. Short, practical refresher sessions held on the floor, with records linked to each SOP revision, give an inspector clearer evidence of competence than an annual classroom course.
The regulators a Silvassa drug plant answers to
- Licensing authority: the UT’s Drugs Controller and State Licensing Authority is based in the Directorate of Medical and Health Services at Moti Daman, so Silvassa licensees deal with an office in the other district.[4]
- Revised Schedule M: the upgraded requirements and the 2025 extension terms described above.[3]
- Outside testing: CDSCO’s compilation as on 20 May 2026 shows no SLA-approved testing laboratory in Dadra & Nagar Haveli, so contract testing has to be qualified at laboratories elsewhere.[5]
- Pollution Control Committee: hazardous waste Form IV and the National Hazardous Waste Tracking System circulars of 2026, and the January 2026 ban on furnace oil and petcoke for boilers and heaters.[6]
- Labour: the four labour codes that came into force on 21 November 2025.[7]
Export registrations and commitments made to foreign regulators belong in the same register, so that a change made for one market is assessed against all of them before it is implemented.
How a Silvassa GMP project is served
Lakshy serves Dadra & Nagar Haveli and Daman & Diu, including Silvassa, from its Vadodara office. Lakshy ISO/GRC experts visit the plant for the gap assessment against revised Schedule M, review of qualification and cleaning validation on the line, a data integrity walk-through in the laboratory, operator training and the mock inspection. SOPs, change controls, deviations and CAPA follow-up run remotely on Effivity between visits. GMP compliance is confirmed by the drug regulatory authorities on inspection; Lakshy prepares the plant. Lakshy has not published a Silvassa case study; the case studies below come from GMP engagements elsewhere in India.
GMP compliance and certification: scope, steps, time and cost
Good Manufacturing Practice (GMP) is the set of controls that makes sure products are consistently made and checked to the quality their use requires: premises and equipment, hygiene, documented procedures, qualified people, validated processes, batch records, complaints and recalls. Which GMP framework applies depends on the product and the market, and compliance is shown either through regulator inspection or through third-party certification.
How a Lakshy project runs. Gap assessment against the framework that applies; SOPs and documentation; facility, process and cleaning validation; training; self-inspection and a pre-assessment; then the authority inspection or the certification audit. A typical project takes 60 to 120 days; facility upgrades and validation batches can extend it.
What it costs. Consulting typically falls between ₹90,000 and ₹3,00,000, depending on scope and man-days, plus certification body fees of roughly ₹40,000–₹60,000 (indicative) where third-party certification applies. Facility upgrades, where needed, are additional. A free gap assessment gives an exact quotation.
Why Lakshy. ISO/GRC experts, 8,100+ clients since 2003, a 100% on-time completion record and certification only through accredited certification bodies. Work between visits runs on the free Effivity platform.
Read the full GMP guide: frameworks, requirements, inspection and costs →
Included in every Lakshy engagement: a five-user Effivity ISO & GRC software subscription and complimentary Sterling Academy awareness e-learning for your team.
Frequently asked questions in Silvassa
Our Silvassa plant filed a Form A plan. What will an inspector look for now?
Evidence that each committed upgrade was completed and is in use, with qualification records, revised procedures and training records to match. Open items need a documented justification and a date.
We have no approved testing laboratory in the district. How do we manage contract testing?
Qualify each outside laboratory through an audit, a quality agreement and a review of its approval or accreditation, and keep transfer and sample-chain records as part of batch documentation.
Does WHO-GMP cover revised Schedule M?
Not automatically. The two overlap heavily, but a gap assessment against the revised schedule is needed to confirm coverage.
Can Lakshy issue a GMP certificate?
No. GMP compliance and WHO-GMP certification are confirmed by the drug regulatory authorities. Lakshy prepares the plant and its people for inspection.
Our plant is small. Which gaps should we close first?
Those that affect product quality directly: data integrity in the laboratory, cleaning validation for shared equipment and control of deviations and changes. Facility upgrades that need capital can then be planned on a dated schedule.
Sources for this page
- WHO-GMP Certified Manufacturing Units for Certificate of Pharmaceutical Products (COPPs) in various states of India (Central Drugs Standard Control Organisation, 2022-12)
- Strategic Investment Plan for the UT of Dadra and Nagar Haveli and Daman and Diu under RAMP Programme (Ministry of MSME (RAMP programme), 2024-11)
- Conditional extension of timeline to small and medium pharmaceutical manufacturers for compliance with revised Schedule M (Press Information Bureau, Ministry of Health and Family Welfare, 2025-02-12)
- SLA's / DC's (list of State Licensing Authorities and Drugs Controllers) (Central Drugs Standard Control Organisation, 2026-04-24)
- Data of Testing Laboratories approved by SLA/UT as on 20.05.2026 (Central Drugs Standard Control Organisation, 2026-05-20)
- Pollution Control Committee (circulars and services) (UT Administration of DNH&DD (ddd.gov.in), accessed 2026-10-23)
- Welfare of Organised and Unorganised Sectors (four labour codes in force) (Ministry of Labour and Employment (PIB release), 2025-12-08)
Client case studies
Selected Lakshy GMP engagements with organisations like yours.
Talk to a Lakshy expert serving Silvassa
Lakshy ISO/GRC experts work on site with organisations across Silvassa. Your first conversation can be a call, a WhatsApp message or a video meeting, and we assign a dedicated ISO/GRC expert to you.
Related pages: GMP in India · ISO certification in Silvassa · All locations
Start with a free gap assessment.
Thirty minutes with a senior specialist, benchmarking your organisation against every requirement of the standard. No cost. No obligation.
Book My Free Session