ISO & GRC consulting across India since 2003 Find consultants near you
FILM / ISO 14971

ISO 14971 requirements explained

Learn what ISO 14971 requires, following the same sequence as the risk management process from planning to post-production review.

FILM LENGTH
2:00
STANDARD
ISO 14971
FORMAT
Requirements explained

Talk to a Lakshy ISO 14971 consultant

Our ISO 14971 expert will get back to you within one business day.

NO SPAM · NO OBLIGATION · CONFIDENTIAL
VIDEO
OVERVIEW

What the video covers

ISO 14971 is written as requirements, but it follows the order of the process itself rather than the shared structure of management system standards. It sets up the process, runs analysis, evaluation and control, reviews the whole before release, and keeps the file alive afterwards.

The film walks through that sequence so the requirements read as a workflow.

KEY POINTS

The requirements in sequence

The first block sets up the process for the entire life cycle. Top management provides resources and competent people, defines the policy and criteria for acceptability, and reviews the process. Each device has a risk management plan and a risk management file.

Risk analysis covers the intended use and reasonably foreseeable misuse, the characteristics related to safety, hazards, hazardous situations and the estimation of risk. Risk evaluation then compares the results against the acceptability criteria.

Risk control selects measures, implements them, verifies they work, considers any new risks they create and evaluates residual risk, including overall residual risk across the device.

A review before release confirms the plan was carried out. Production and post-production activities then collect information and feed it back into the file.

HOW WE HELP

How Lakshy helps

Auditors look for a clear thread from hazard to control to verification. Lakshy helps you build that thread with templates, training and a review of existing files, so that gaps are found before an auditor finds them.

Try Design™ if your engineers prefer to implement under guidance, or Drive™ if you would like us to carry the work end to end.

There is no certificate for ISO 14971, and Lakshy does not certify. Your process and files are examined within other audits.

KEY TAKEAWAYS

What to remember

  • The requirements follow the sequence of the risk management process.
  • Plan and file exist per device, and top management defines acceptability criteria.
  • Risk control must be verified and checked for new risks it creates.
  • Production and post-production information keeps the file alive.
INCLUDED IN EVERY LAKSHY ENGAGEMENT

Software and e-learning, at no extra cost

Effivity ISO & GRC software

Run your management system in software, not spreadsheets.

A five-user Effivity subscription comes with every engagement: documents and records, internal audits, corrective actions and KPI dashboards in one place, configured by the expert who builds your system.

See what Effivity includes →
Sterling Academy e-learning

Build awareness across your whole team.

Complimentary awareness e-learning on your standards for your employees, with practice checkpoints, a final exam and a numbered Certificate of Completion, verifiable online. More courses, from practitioner to internal auditor, are available on Sterling Academy.

Visit Sterling Academy →
FAQS

Frequently asked questions

What is residual risk?

It is the risk that remains after controls are applied. Each residual risk is evaluated against your acceptability criteria, and the overall residual risk of the device is also evaluated and disclosed as the standard requires.

What is reasonably foreseeable misuse?

It is use of the device in a way not intended by the manufacturer but that can be predicted from human behaviour or the environment. Considering it during analysis helps catch hazards that would otherwise only appear after launch.

NEXT STEP

Start with a free ISO 14971 gap assessment.

Thirty minutes with a senior specialist, benchmarking your organisation against every requirement of the standard. No cost. No obligation.

Book My Free Session
BUYER BEWAREA certificate in 7–10 days — no audit, no implementation — is not certification. It is paper.Know the red flags →
Scroll to Top